Schedule Doctor

P6 XER → check the logic (DCMA) · fix durations with NYC trade rates from the plans · recompute CPM. AI reads the plans; the schedule math is computed locally. · Grupoae LLC
The logic check is deterministic (math on your XER). Duration correction is AI-assisted from the plans and uses an editable NYC rate table — always review before use. CPM runs on a 5-day work-week calendar (not P6 per-activity calendars), so dates can differ by a few days from P6.

0 Setup

1 Panel A — Upload P6 XER

📂 Drop .xer here, or click to browse

2 Panel B — Plans & description

📐 Drop plans (PDF/images), or click

3 NYC production rates (durations come from here — editable)

Duration (work days) = Qty ÷ crew daily output. Seeded with NYC-standard rates; adjust to your crews.
Trade / workUnitCrew daily output

5 Recompute CPM & export

📋 Log

Ready.